Skip to content
Original APM photograph of a compression tee used as a parts-reference example

Repeat maintenance orders: a parts reference sheet for each property

“The same as last time” is a useful starting point, but a clear repeat order needs a reference for the job, the location and the exact part. This matters when a maintenance visit covers several properties or rooms: two similar-looking fittings can have different sizes, and two bulbs can have different caps or light characteristics.

Keep a short parts reference sheet after a confirmed purchase. On the next enquiry, use it to identify what you bought and what needs checking again. The aim is to repeat the intended item, not an assumption about its appearance, price or availability.

The worked examples below use the Integral B22 GLS bulb and Embrass Peerless 15mm compression equal tee. Use the exact specification for your own job; these examples are not a selected maintenance bundle.

A simple repeat-order workflow

Original APM ordering workflow. Keep the job identity and the product identity together.

Seven fields worth keeping

  • Your job code: use the same reference on the enquiry, collection note and your own job record.
  • Location: for example, a particular room or fixture. “Kitchen pendant” is more useful than “bulb”.
  • Exact description: manufacturer, model, size or connection, finish and any installer-specified requirements.
  • Product reference: the manufacturer part number or barcode, plus a clear photo of the relevant label where available.
  • Quantity and unit: record whether you need individual items, a stated pack or a measured length. Do not treat a supplier’s bag quantity as the retail sale unit without confirmation.
  • Previous order reference and date: this helps identify the earlier item; it does not hold its old price or reserve more stock.
  • Confirmation notes: record an agreed substitute, changed reference or pack detail so that the next request starts from the right version.

Two examples of useful product references

The examples below are separate catalogue items to show how a reference sheet works. They are not a maintenance bundle or a recommendation for every property.

Lighting: name the cap and the exact lamp

The Integral B22 GLS bulb, reference 5055788212621, is an example of a specific lamp listing. For a repeat request, record the full reference and the cap, required brightness, colour and dimming requirements. Do not order simply by “large bulb” or copy a wattage from memory.

If the current description, manufacturer information or supplied pack differs from an earlier purchase, ask us to confirm the actual version before paying. A familiar barcode or box photograph does not settle every specification or dimmer-compatibility question.

Original APM photograph of the Integral B22 GLS bulb example
Keep the lamp reference with the location where the replacement is required. Confirm the actual supplied version.

Plumbing: name each connection and the required unit

The Embrass Peerless 15mm compact compression equal tee, reference 318310, is an example of a fitting reference. A request for “a tee” leaves the connection type and sizes unresolved. Keep the installer’s exact specification with the part number and required quantity.

Confirm the actual service, pipe material, operating requirements and supplied contents with the installer. Do not assume that a similar-looking fitting, a different finish or a supplier’s pack description is the same item or sale quantity.

Keep separate jobs separate

Use one short section per job or location, then add an overall enquiry reference. This lets you check a proposed substitution or quantity change against the right job.

Example reference sheet — fill in your own details

Job code: [your reference]
Location: [room / fixture]
Item: [manufacturer and full description]
Part reference: [model / barcode]
Installer requirements: [confirmed specification]
Quantity and unit: [number of pieces / stated packs / length]
Previous order and date: [if available]
Changes to confirm: [reference / version / contents / substitute]

When a part is approved as a substitute, keep its actual reference rather than leaving the old one on the sheet. For future visits, distinguish a confirmed replacement from an item still awaiting identification.

Send one clear repeat enquiry

“Repeat maintenance enquiry [your reference]. Previous order: [reference/date]. Please check the attached job-by-job list and confirm the exact current items, quantity units, any changed references or pack details, price and availability. Please identify proposed substitutes separately. Required for [postcode / Acton collection] on [date].”

Attach safely obtainable product or packaging photos where they help identification. Do not remove electrical covers, disturb hot or pressurised equipment, or dismantle an installation for photographs. Ask the competent installer to specify parts where fit or safety depends on the installation.

Call 020 8702 8080 or WhatsApp the shop; alternatively call 07737 263641 or WhatsApp the company mobile. See our Acton counter and contact details. Confirm the order, availability and collection arrangements before travelling.

For a first plumbing enquiry, our separate materials-list quote checklist explains the initial description and photo details. Use this repeat-order sheet to keep the confirmed references organised afterwards.

Product references checked 3 November 2026 against the exact APM listings, Integral’s current model reference and the Embrass Peerless product guide. Confirm the actual supplied version and contents for the job.

Previous article Reading LED energy labels: watts, lumens and kWh per 1,000 hours
Next article Immersion heater length vs thermostat length: why the numbers differ

Leave a comment

* Required fields

Compare products

{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

Select first item to compare

Select second item to compare

Select third item to compare

Compare