A consumer unit and its protective devices must be selected as an approved assembly for the actual installation. Start with the electrician's circuit schedule, supply assessment and manufacturer's references. A metal enclosure, a “12-way” label or a familiar breaker shape is not proof of a complete suitable installation.
Safety first: switching off the consumer unit does not establish that incoming tails or every other supply is isolated. Do not remove its cover, disturb meter equipment or expose conductors to obtain a photograph. Have a competent electrician identify the supplies and establish safe isolation before work. An RCD cannot protect against every electric shock; do not treat 15mA, or any quoted current, as a safe level for a person. Repeated tripping, heat damage or a burning smell needs professional investigation, not a larger breaker or repeated resetting.
These are direct links to current product pages. Online stock is a system record, not a physical stock, approval or pack inspection. Confirm exact parts and contents before ordering; current price, availability and fulfilment information are on the product pages.
Send the electrician's materials list: call or WhatsApp 020 8702 8080 or 07737 263641. Include the board make/model, specified protective-device codes, quantity and required accessories. Use visible labels, packaging or disconnected spares for photos; do not open a live or potentially live enclosure for an enquiry.
Checked on 2 November 2026, the IET's current-edition guidance identifies BS 7671:2018+A4:2026 and states that the previous transition ended on 15 October 2026. The electrician must establish the applicable edition and project circumstances. Historic “Amendment 3” wording on a product or old catalogue is not a certificate that the finished installation meets current requirements.
This article is a buying checklist, not a consumer-unit installation manual or a substitute for the standard. The need for replacement or upgrading should follow assessment of the existing installation and proposed work, not a blanket assumption from the age of a board or a catalogue description.
Do not confuse an MCB's B or C tripping curve with an RCD's waveform type, such as Type A or Type B. The MK Sentry catalogue identifies these characteristics separately. Its family examples are not permission to substitute one device or generation for another.
An individual RCBO arrangement can reduce the effect of a fault on other circuits, but coordination with upstream protection and the actual design still matter. A shared-RCD arrangement requires careful circuit division and assessment of unwanted tripping and its consequences. There is no universal rule that every new installation must use one RCBO per circuit, or that a nominal dual-RCD board is automatically suitable.
Electrical Safety First's Wiring Regulations guidance discusses circuit division and manufacturer compatibility. Its Q1.40 warns against mixing equipment without the assembly manufacturer's confirmation of the specific arrangement. Physical DIN-rail fit, a shared brand name or matching current ratings alone are insufficient.
Ask for a manufacturer-supported layout showing incoming devices, outgoing circuits, required surge or arc-fault protection, control modules and spare capacity. Total enclosure modules and usable outgoing ways are different measurements. There is no universal conversion from a 16-way MCB board to a 24-way RCBO board.
The manufacturer-authored Sentry catalogue lists the Y5712SMET enclosure with a switch-disconnector and a further ten one-module products. This is an example of checking the exact reference, not physical certification of APM's supplied unit. Confirm current instructions, compatible devices, busbar and neutral arrangements, blanks, entries, enclosure protection and required accessories for the actual revision.
This checklist does not prescribe cable sizes, fuse upgrades, terminal connections, torque values, test voltages, pass thresholds or energising steps. HSE's electrical-safety guidance explains competence, secure isolation and the limits of RCD protection.
Agree responsibility for design, installation, inspection, testing, documentation and any notification route before work starts. Country and work scope matter: use the official England Approved Document P and the separate Wales guidance where applicable. Buying a board does not provide an installation certificate, and an EICR is not the same document as certification of new installation work.
These working links provide related reading; they do not replace current primary instructions or recertify the contents of those pages:
For help matching a specified part, send the list to either business WhatsApp number above. Confirm the exact approved assembly with the electrician and manufacturer before purchasing components.